The 2017 edition of the NEC is being revised to include important changes
Tentative New Articles On:
- Fixed Resistance and Electrode Industrial Process Heating Equipment- Article 425
- Large Scale Photovoltaic Electric supply Stations – Art 691
- Energy storage systems – Art 706
- Direct Current microgrids – Art. 712
Tentative New Requirements in Existing Articles For:
- Torque requirements for electrical connections - Art 110.14 (D)
- Fault current and OC clearing time on service equipment – Art . 110.16(B)
- Working space around equipment with limited access – Art. 110.26 (A) (4)
- GFCI requirements in other than dwelling units - Art. 210.8
- Receptacle requirements for meeting rooms – Art. 210.71
- Arc energy reduction fuses. – Art 240.67
- Single phase feeder for dwellings at 120/208 reduced size- Art 310.15 (B) (7)
- Box connections to separable attachments - Art 314.27 (E)
- New tables for classification of Major and minor repair garages- Art 511.3 (C) (D)
- Photovoltaic powered sign - Art 600.34
- Electrically powered pool lifts- Art. 690.81